Turkish Aerospace builds a second production line for its Anka 3 drone
The line is scheduled to open in November and will make a larger variant with a payload of 1.75 tons, up from about 1.3 tons.
The line is scheduled to open in November and will make a larger variant with a payload of 1.75 tons, up from about 1.3 tons.